Skip to content

CDE for Malaysian Construction Industry

Built for how construction actually works in Malaysia.

JKR BINAXONE is the Common Data Environment aligned with JKR BIM standards, ISO 19650, and Malaysian procurement realities, so your documents, models, and approvals move at the speed of the project.

Hosted in Malaysia· ISO 19650-aligned· IFC-native· JKR BIM standards
JKR BINAXONE connected workspace

One platform. Every stage of the project.

From BPEP through handover and into operations, JKR BINAXONE covers the workflows construction industry teams actually run. Browser-native, open-standards based, and ready on day one.

3D BIM Model Viewer

Browser-native. No plugins, no desktop install. Open federated models on any device, straight from a link.

Document Management & CDE Workflows

Controlled issue, transmittals, revisions, and approvals, all structured around ISO 19650 states.

BPEP

Live BIM Project Execution Plan: roles, LODs, exchange requirements, and milestones tracked in-platform.

Design & Construction Workflow

One unified workflow across both phases, from design WIP through construction delivery and archive, with digital sign-off captured at every transition.

Access Control / RBAC

Granular role-based access mirrored to real project structures: client, PMC, consultant, contractor, sub-contractor.

Audit Logs & Digital Signing

Every action time-stamped, every sign-off cryptographically bound to the artefact. Export a complete project chain-of-custody when auditors or arbitration call for it.

Design Phase

Design together, in real time.

Architects, engineers, and BIM managers co-author, coordinate, and resolve issues on the same source of truth. Less email, fewer surprises, and clash-free models by the time they reach site.

Design · Mobile companion
JKR BINAXONE desktop design workspace

Real-time Co-Authoring

Multiple architects and engineers edit the same Revit model simultaneously, changes syncing live. And the AI copilot works right alongside them, building, tagging, and filling elements on command while your team reviews and approves.

Model Coordination & Clash Detection

Automatic clash detection across architectural, structural, and MEP models, with AI that cuts through the noise: grouping related clashes, ranking what to fix first, and drafting the resolution notes. Coordination meetings start at the answer, not the list.

Issue Tracking & Markups

Create, assign, and resolve issues anchored to 3D elements or 2D sheets, synced across Revit, Navisworks, and web/mobile. AI writes the issue description from your markup, suggests the right assignee, and briefs you each morning on what's blocking sign-off.

Workflow

From draft to published: one workflow, fully signed.

Every document and model moves through enforced ISO 19650 states, with digital sign-off captured at each transition. Auditable end-to-end, exportable on demand.

Stage 1
WIP
Stage 2
In Review
Stage 3
Published
Post-quantum signed Audit trail ISO 19650 RBAC enforced
Site · Construction view
JKR BINAXONE mobile app

Construction Phase

From design handover to site delivery, one continuous record.

JKR BINAXONE follows the project past tender. Site teams, PMC, and contractors work off the same model and documents that design signed off on, with construction-grade workflows layered on top.

Site Progress Tracking

Capture daily progress photos and geotagged inspections against the BIM model, then let AI write the site diary: reading the photos, updating percentage-complete, and flagging where the site is drifting from the programme.

On-Plan Pin Documents & Defect Management

Pinpoint defects directly on the model or drawing. AI classifies each defect from its photo, routes it to the right contractor, and drafts the closure report. Nothing slips between handover and DLP.

Built-in JKR SPB Quality Forms

Field teams always work from the latest JKR SPB site record templates, and AI pre-fills them from data already captured on site, then summarises quality trends across forms so project leads see problems while they're still cheap to fix.

Facility Management Phase

The model keeps working, long after handover.

Most as-built models end up in a folder nobody opens. In JKR BINAXONE, handover is where the model starts its second life: a live, BIM-based CMMS run on the same model your team built. No re-keying asset data, no starting from zero.

Operations · BIM-based CMMS
JKR BINAXONE facility management showing a live asset register on the BIM model

Live Asset Register on the Model

Every pump, chiller, and switchboard carries its specs, warranty, and O&M data on the model. AI builds the register for you, extracting it from handover documents automatically, and answers questions like "which assets are still under warranty?" in plain language.

Predictive Maintenance & Digital Twin

Connect IoT, SCADA, and BAS feeds to turn the model into a living digital twin. AI watches live telemetry and years of service history to predict failures, schedule the right maintenance at the right time, and raise work orders before breakdowns, not after.

Space & Lifecycle Management

Track occupancy, condition, and remaining life across the whole estate. AI forecasts renewal budgets and flags where intervention now extends asset life later. Longer life cycles, fewer surprises, lower total cost of ownership.

New · BINAXONE AI Copilot Suite

You don't draft. You direct.

One AI copilot inside every tool you build with. It builds, tags, and fills your model while you review and approve. And your first JKR compliance check runs free, in 60 seconds.

Available now Revit Coming soon AutoCAD Civil 3D MS Project
AI Copilot · You direct, it builds
An architect directs the BINAXONE AI copilot, which assembles the BIM model, floor plans, site data, and project schedule automatically

JKR compliance in 60 seconds

BIM is now mandatory on RM10M+ projects, and one rejected submission costs you weeks. Run a JKR Compliance Check on a real model and catch it before the counter does.

Works inside your tools

No new platform to learn. The Revit copilot installs straight into your workflow today, with AutoCAD, Civil 3D, and MS Project copilots on the way. Every plan includes them all as they land, so tiers differ by usage, never by capability.

One meter. No credit math.

No credits to buy, no per-action charges. A simple session and weekly allowance you can always see. If you run low, we never hard-stop you mid-project.

Install free · first check in 60s

Free plan, no card required.

Why teams choose JKR BINAXONE.

Four reasons teams across the Malaysian construction industry make JKR BINAXONE their CDE of choice.

Data Sovereignty

Hosted on TM One Cloud Alpha in Malaysia. Your project data is stored, processed, and backed up inside Malaysian jurisdiction, and never leaves the country.

Open Standards

IFC-native with full support for open BIM formats. Your models remain portable, interoperable, and fully yours, today and well into the future.

Quantum-Ready Security

Post-quantum cryptography for document signing and BIM file integrity, aligned with Malaysian national cybersecurity direction. Long-lived infrastructure projects deserve long-lived cryptography.

Built for Malaysian Workflows

Aligned with JKR BIM standards, ISO 19650, and the procurement realities government agencies and contractors actually face. Localised, not translated.

Pricing & Engagement.

Every engagement quoted to your scope, across the full project lifecycle. License modules individually or as a complete bundle.

Platform · JKR BINAXONE Modules

Design Phase

CDE

Common Data Environment, where every discipline designs on one source of truth.

Contact for pricing
  • Real-time co-authoring with the AI copilot in the model
  • Browser-native 3D BIM viewer, IFC-native
  • AI clash detection, triage & coordination
  • ISO 19650 workflows, BPEP & digital sign-off
  • Issue tracking & markups with AI-drafted descriptions
Contact Sales

Construction Phase

ICMS

Integrated Construction Management System, the design record carried onto site.

Contact for pricing
  • Site progress tracking with AI-written site diaries
  • Defect management: AI classifies, routes & drafts closure
  • JKR SPB quality forms, AI pre-filled from site data
  • Documents, transmittals & correspondence on the project record
  • Verified as-built handover & O&M package
Contact Sales

Facility Management Phase

CMMS

BIM-based maintenance management, the as-built model alive and working after handover.

Contact for pricing
  • Live asset register, AI-built from handover documents
  • Predictive maintenance & digital twin with IoT, SCADA, BAS
  • AI asset intelligence: plain-language answers from your data
  • Space & lifecycle management with renewal forecasting
  • Work orders & full service history per asset
Contact Sales

License modules individually or as a full-lifecycle bundle. Flexible models available, annual subscription or pay-per-project, tailored to government procurement and private-sector contract structures. All modules include SSO, custom RBAC, Malaysian hosting, and dedicated onboarding.

Frequently asked questions.

What is a CDE and why do I need one?
A Common Data Environment is the single, controlled source of truth for project information: drawings, models, correspondence, approvals. It replaces email chains and shared drives with structured workflows, audit trails, and enforced review gates. For any project of meaningful size, a CDE isn't optional; it's the only way coordination holds together.
Is JKR BINAXONE compliant with ISO 19650 and JKR BIM standards?
Yes. The platform is built around ISO 19650 information states and JKR BIM standard deliverables, including BPEP structure, naming conventions, and transmittal workflows. Reviews, approvals, and digital signatures are captured in a form that maps directly to JKR audit expectations.
Where is my data stored?
On TM One Cloud Alpha, hosted in Cyberjaya, Malaysia, a Tier III data centre operated by a Malaysian vendor. Your project data is stored, processed, and backed up entirely within Malaysian jurisdiction.
What file formats are supported?
JKR BINAXONE is IFC-native and supports common open BIM formats, alongside standard document formats (PDF, DWG, DOCX, XLSX, images). Open formats are first-class citizens, not a second-tier export path.
How does JKR BINAXONE compare to other CDE platforms?
JKR BINAXONE is purpose-built around JKR workflows, Malaysian procurement practice, and local data-sovereignty requirements. You get strong technical capability alongside local hosting, support, and accountability, with licensing structures that align naturally with government and industry procurement in Malaysia.
Can JKR BINAXONE be deployed on-premise?
Yes. Enterprise engagements support dedicated tenancy on TM One Cloud Alpha, hybrid deployments, or full on-premise installation inside an agency's own data centre for the most sensitive programmes.
What does "post-quantum cryptography" mean for my documents?
Today's digital signatures can become forgeable once quantum computing matures. Infrastructure projects outlive the cryptography that signed them. Post-quantum algorithms are resistant to attacks from future quantum machines, which means a document signed in JKR BINAXONE today stays legally and technically verifiable decades from now, aligned with Malaysian national cybersecurity direction.
What is the BINAXONE AI Copilot Suite, and is it part of the CDE?
The Copilot Suite is a set of AI plugins that install directly into your design tools. The Revit copilot is available now, with AutoCAD, Civil 3D, and MS Project coming soon. The AI builds, tags, and fills your model while you review and approve, and runs JKR compliance checks in about 60 seconds. It's self-serve with a free tier (no card required) and works whether or not your project runs on the JKR BINAXONE CDE. Install it at plugins.jkrbinaxone.com.
What happens to the model after handover?
It keeps working. The verified as-built model becomes the backbone of a BIM-based CMMS: a live asset register, planned and reactive maintenance, and space and lifecycle management, all run on the same model your project team built. Facilities teams inherit complete, structured asset data on day one instead of a box of PDFs.
How is JKR BINAXONE priced?
Three tiers (Starter, Professional, Enterprise), each quoted to scope. Licensing can be structured as annual subscription or pay-per-project to match government procurement processes and private-sector contracts. Contact sales for a tailored proposal.

Let's talk.

We'll get back to you within 1 business day.